Office Refurbishment on 3 Floors over 4 Phases

Project Description:

Complete strip out, part demolition, in depth design and full refurbishment of office space on three floors over 4 phases. Close collaboration with the client was required to provide the high quality design for the Directors’ Suite and the exacting way in which the project was implemented with full occupation of the premises during the operations on site.
Leading full team of consultants and project managing the Directors’ Suite after careful selection of local tradesmen to carry out the high quality of works.

Project value:   £1M

Professional Services:  Full architectural for the general office areas under a traditional contract and direct project management of individual trades for the Directors’ Suite.